Last day drywall

November 10

Curtis Winstead  left when I refused to give him any more money until the project was done. Not one portion was completed

Drywall

Pieces missing, some joint tape missing, rough surfaces throughout requiring weeks of work to prep for painting. They were also supposed to paint.

closeup of missing drywall gouged and blurred finished drywall corner

Last day wiring

November 10

Done Right Contracting LLC left when I refused to give any more money until the project was done. Not one portion was completed

Wiring

Wires, plugs and switches left hanging live out of all walls. Multiple shorts had to be traced and repaired to get kitchen fully functional. All light fixtures had to be installed.

plug left hanging plug and wires hanging out of wall

 

 

  

Last day outside

November 10

Curtis Winstead and Done Right Contracting LLC left when I refused to give him any more money until the project was done. Not one portion was completed

Outside

Shows roof on addition and porch not finished, siding not installed, deck not removed, debris not removed, window and remaining wall not installed and foundation not backfilled. Also shows makeshift stairs they expected us to use when tile was being installed, since front door was not usable.

incomplete, not to code front porch  side

Last day basement

November 10

Curtis Winstead and Done Right Contracting LLC left when I refused to give him any more money until the project was done. Not one portion was completed

Cellar

Shows original ledger beam between kitchen and dining room, repaired ledger beam on outside, mess left in main cellar from rip out and mess in storage room in cellar, showing wiring mess.

ledger board storage room temporary support poles left in place mess left in main basement